Logotype for Black Canyon Limited

Black Canyon (BCA) Q4 2024 TU earnings summary

Event summary combining transcript, slides, and related documents.

Logotype for Black Canyon Limited

Q4 2024 TU earnings summary

19 Nov, 2025

Executive summary

  • Released a positive Scoping Study for KR1 and KR2 deposits, confirming strong financial returns with a 16-year mine life and robust project economics.

  • Controls the largest manganese Mineral Resource in Western Australia, totaling 314 Mt @ 10.5% Mn, with 33.1 Mt contained manganese.

  • Ongoing exploration at the high-grade Wandanya Project, with drilling scheduled for the next quarter following promising surface samples.

Financial highlights

  • Scoping Study for KR1 and KR2 projects estimates pre-tax NPV of A$340m (8% discount rate) and pre-tax IRR of 70%.

  • Life of Mine (LOM) revenue projected at A$2,781m and EBITDA at A$654m, with average annual operating cashflow of A$46.1m.

  • Modest capital requirement of A$84m and payback period of less than two years.

  • Cash balance at 30 June 2024 was A$702k, with no debt.

  • Expenditure for the quarter: A$382k on exploration and evaluation, A$153k on admin and corporate costs.

Outlook and guidance

  • Planned RC drilling at Wandanya and infill drilling at KR2 to upgrade resources.

  • Continued hydrometallurgical testwork to produce battery-grade HPMSM.

  • Reviewing locations for a HPMSM facility in Australia and progressing offtake discussions.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more