Corporate Presentation
Logotype for Central Asia Metals plc

Central Asia Metals (CAML) Corporate Presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Central Asia Metals plc

Corporate Presentation summary

3 Jul, 2025

Operational performance

  • 2024 copper production reached 13,439t at Kounrad, with a 2025 guidance of 13,000-14,000t copper cathode.

  • Sasa mine produced 18,572t zinc and 26,617t lead in 2024; 2025 guidance is 19,000-21,000t zinc and 27,000-29,000t lead.

  • Kounrad's H1 2024 C1 cash cost was $0.78/lb with a 72% EBITDA margin; Sasa's H1 2024 C1 cash cost was $0.70/lb with a 37% EBITDA margin.

  • Sasa transitioned to paste fill mining, with 40% of tailings placed underground and a new Dry Stack Tailings Plant operational in Q1 2025.

  • Central Decline at Sasa completed, improving haulage and ventilation efficiency.

Financial highlights

  • Group EBITDA for H1 2024 was $49.1m with a 47% margin; profit after tax was $23.8m, up 14% YoY.

  • Group cash at 31 December 2024 was $67.6m; company remains debt-free.

  • H1 2024 free cash flow was $30.0m; H1 2024 capex totaled $8.3m, with 2024E capex expected at $22-25m.

  • Since IPO, ~$360m returned in dividends, exceeding $214m raised in equity.

  • Interim dividend of 9p paid in H1 2024.

Growth and exploration

  • Reviewing a pipeline of accretive base metal opportunities in Europe and Kazakhstan.

  • Invested £3m ($3.8m) for a 28.4% stake in Aberdeen Minerals, with potential to increase to 37.6%.

  • Early-stage exploration in Kazakhstan with two licenses granted and two pending.

  • Successful summer drilling campaign in Scotland, recovering visible massive sulphides.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more