Jet AI (JTAI) Corporate presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Jet AI Inc

Corporate presentation summary

25 Mar, 2026

Project overview

  • Site located in Winnipeg, Manitoba, benefits from abundant hydropower and natural gas, making it ideal for data center development.

  • On-site infrastructure currently supports 2MW of flowing power, with potential for significant expansion.

Power infrastructure

  • High-voltage transmission lines run directly overhead, connected to the Riel Converter Substation, which supports 2,000 MW.

  • Manitoba Hydro provides cost-effective, reliable, and sustainable electricity, with 97% of provincial power from hydro sources.

  • 115 kV transmission lines and a substation are located directly adjacent to the site, ensuring robust power access.

Natural gas access

  • Major pipeline from Alberta is only 0.5 miles away, with a T-junction for access to eastern Canada and the US Midwest.

  • Adjacent gas transmission substation enables direct piping, enhancing fuel reliability and redundancy.

  • Gas can be piped from a regional distribution station servicing nearly all of Manitoba.