Kinross Gold (K) Investor Presentation summary
Event summary combining transcript, slides, and related documents.
Investor Presentation summary
26 Nov, 2025Project overview and highlights
Preliminary economic assessment (PEA) confirms a high-margin, top-tier gold mine with robust economics and significant exploration upside.
Average annual gold production projected at 518 koz for the first 8 years, with a 12-year initial mine life and strong underground expansion potential.
After-tax NPV of $1,898M at $1,900/oz gold price, 24.3% IRR, and $491M average annual free cash flow; higher metrics at $2,500/oz gold.
All-in sustaining cost (AISC) of $812/oz and life-of-mine cash cost of $594/oz.
Initial capital requirement of $1.4B, with robust indirect and contingency costs included.
Resource growth and exploration
Over 520 km of drilling since acquisition, defining 2.7 Moz measured & indicated and 3.9 Moz inferred resources as of April 2024.
Drilling below current resource shows strong potential for further expansion, especially at depth.
2024 drilling added over 500 koz inferred resource, with high-grade intercepts continuing at depth.
Resource remains open at depth and along strike, with brownfield exploration on a 120 km² land package.
Mine plan and production profile
Combined open pit and underground operations drive mill grades over 4 g/t, with peak annual production exceeding 600 koz.
Open pit features high-grade ore (4.2 g/t in first 8 years), robust geotechnical conditions, and a 6.7 strip ratio.
Underground mine uses long-hole open stoping, steady-state 6,000 tpd rate, and average grade of 4.9 g/t.
Significant flexibility from blending high-grade open pit and underground ore.
Latest events from Kinross Gold
- Record free cash flow, robust earnings, and 40% capital return target highlight 2025 results.K
Q4 202519 Feb 2026 - Strong Q2 results, robust cash flow, and key project milestones support 2024 guidance.K
Q2 20242 Feb 2026 - High-margin, long-life gold project with robust economics and strong growth potential.K
Status Update21 Jan 2026 - Record free cash flow, margin growth, and debt reduction drive strong Q3 and outlook.K
Q3 202416 Jan 2026 - Three U.S. projects advance, targeting 3Moz, $4.1B NPV, strong returns, and mine life extension.K
Status Update15 Jan 2026 - Stable 2Moz annual gold output, strong cash flow, and leading ESG drive value and returns.K
Investor presentation15 Jan 2026 - Record free cash flow, stable outlook, and share buyback planned for 2025.K
Q4 20248 Jan 2026 - Record cash flow, board transition, and sustainability highlight a strong year.K
AGM 202530 Dec 2025 - Strong production, robust reserves, and leading ESG drive growth and value across key assets.K
Investor Presentation26 Nov 2025