Lhyfe (LHYFE) Trading Update summary
Event summary combining transcript, slides, and related documents.
Trading Update summary
6 Jun, 2025Financial performance and commercial growth
2024 revenue reached €5.1 million, quadrupling 2023 results and aligning with guidance.
Client base expanded to around 50, with over 470 deliveries and a 99% service rate in France and Germany.
Signed significant multi-year offtake contracts in France and Germany, including a 5-year deal with H2 Mobility for over 240 tonnes/year.
New contracts with Hysetco and a French refueling operator for more than 45 tonnes/year each, and a 3-year deal with a major energy player.
Built one of the largest hydrogen delivery fleets in the EU, operating 70 tube trailers across 8 countries.
Production capacity and project development
Installed electrolysis capacity increased to 22 MW, nearly quadrupling year-on-year.
Bouin site capacity to rise from 1 to 2.5 MW in 2025; Buléon and Bessières (5 MW each) began deliveries, now France's largest bulk green hydrogen sites.
In Germany, Tübingen (1 MW) and Schwäbisch Gmünd (10 MW) sites installed, with commercial ramp-up set for 2025.
Construction advanced at Croixrault (5 MW) and Le Cheylas (10 MW) in France, with Le Cheylas supplying HYmpulsion and regional manufacturers from 2025.
Project pipeline and strategic partnerships
Project pipeline at end-2024 totaled 9.1 GW, with 558 MW at advanced development stages.
Secured €11m subsidy for a 10 MW plant in Sweden and continued to secure grants, totaling €242m by year-end.
Exclusive partnership with Elyse Energy for e-methanol production and with OX2/Velarion for a 300 MW hydrogen cluster in Sweden.
Signed MoU with Masdar to co-develop large-scale green hydrogen projects in Europe.
Latest events from Lhyfe
- Revenue quadrupled, capacity soared, and €242m in grants set the stage for rapid growth.LHYFE
H2 202417 Mar 2026 - 2025 revenue doubled, production capacity expanded, and a major cost reduction plan announced.LHYFE
H2 2025 TU3 Feb 2026 - 2025 revenue doubled, production capacity up 70%, and a 30% cost reduction plan starts in 2026.LHYFE
H2 20253 Feb 2026 - Doubling 2025 revenues, expanded capacity, and a 30% cost cut drive growth and profitability.LHYFE
Trading Update19 Dec 2025 - Revenue tripled to €4.6m, with expanded capacity, strong financing, and EU certification.LHYFE
H1 202530 Sep 2025 - Revenue quadrupled and losses narrowed as Lhyfe accelerated project and contract growth.LHYFE
H1 202413 Jun 2025