Investor Presentation
Logotype for Odyssey Gold Limited

Odyssey Gold (ODY) Investor Presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Odyssey Gold Limited

Investor Presentation summary

18 Nov, 2025

Resource base and project overview

  • Indicated and inferred resource of 5.14Mt at 2.5g/t Au for 407koz, with 80% project ownership translating to 325koz at Tuckanarra, trading at A$47/oz.

  • 4.2Mt at 2.3g/t Au for 311koz located on granted mining leases, with mining proposals and environmental approvals in place.

  • Resources are situated in a district with over 7.5Mtpa of milling capacity and are less than 1km from a sealed highway.

  • JORC-compliant resource includes 2.25Mt at 3.9g/t for 283koz above a 2g/t cut-off.

Exploration and development potential

  • Ongoing exploration is expanding resources at Highway and Bollard, with step-out drilling confirming high-grade mineralisation.

  • Recent drilling at Highway Zone and Bollard returned high-grade results, such as 11m at 7.8g/t Au and 7.65m at 11.8g/t Au.

  • EM surveys and drilling have identified deeper sulphide-rich targets, with strong correlation between conductors and gold mineralisation.

  • High-grade shoots remain open at depth, with underground potential demonstrated at both Highway and Bollard.

Strategic positioning and market context

  • Multiple regional gold producers face rising costs and declining grades, increasing the value of shallow, high-grade ounces.

  • Accelerating M&A activity in the WA goldfields highlights the strategic value of the project.

  • Tribute and joint venture mining and processing options offer low-risk, low-cost pathways to cashflow.

  • Capital and operating cost deflation in WA is improving the economics of smaller deposits.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more