Company presentation
Logotype for Marimaca Copper Corp

Marimaca Copper (MARI) Company presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Marimaca Copper Corp

Company presentation summary

30 Jan, 2026

Project overview and development status

  • Marimaca is a large-scale copper project in Chile, advancing toward a construction decision with a Definitive Feasibility Study (DFS) targeted for Q3 2024.

  • The project features a simple, low strip ratio open pit operation and is located in a Tier 1 mining jurisdiction with proximity to major infrastructure.

  • Water supply is secured via a recycled seawater pipeline from Mejillones, eliminating the need for continental or fresh water.

  • The project is positioned as a 'green copper' operation, with heap leaching that is 38% less carbon intensive than traditional processing.

  • Permitting is being fast-tracked under the DIA route, with the first milestone achieved in February 2024.

Mineral resources and exploration potential

  • The 2023 Mineral Resource Estimate (MRE) reports 200Mt at 0.45% CuT (899.7kt contained copper) in Measured & Indicated, and 37.3Mt at 0.38% CuT (141.3kt) in Inferred categories.

  • 86% of total resource tonnes are now in Measured and Indicated categories, reflecting significant de-risking.

  • Consistent resource growth has been achieved through successive drilling campaigns since 2017.

  • District-scale exploration is ongoing, with targets such as Pampa Medina and Madrugador offering both oxide and sulphide expansion potential.

  • Exploration targets at Cindy, Roble, Mercedes, Tarso, and Sierra could add significant leachable resources to the MOD production capacity.

Operations, infrastructure, and processing

  • The project benefits from close proximity to port, power, water, acid, and workforce, reducing execution risk.

  • Simple SX-EW processing flowsheet supports robust project economics and low complexity.

  • Extensive metallurgical testing has been completed, underpinning DFS recovery and acid consumption assumptions.

  • Heap leach recovery is estimated at 76% of total copper, with a cut-off grade of approximately 0.15% CuT.

  • All major consumables for SX-EW operations are accessible within 25km of the site.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.