Odyssey Gold (ODY) Company presentation summary
Event summary combining transcript, slides, and related documents.
Company presentation summary
24 Jun, 2026Resource overview
Indicated and inferred resource of 5.14Mt at 2.5g/t Au for 407koz, with an 80% attributable share of 325koz at A$46/oz.
High-grade subset: 2.25Mt at 3.9g/t for 283koz above 2.0g/t Au cut-off.
4.2Mt at 2.3g/t Au for 311koz on granted mining leases, with resources close to major processing plants.
Resources are accessible, with previous mining proposals, hydrology, flora/fauna, and heritage surveys completed.
Metallurgical recovery testwork completed on most deposits, supporting development plans.
Exploration and development potential
Multiple high-grade open pit and underground targets identified, including Highway Zone, Bollard, and Cable.
Recent drilling at Highway Zone intersected high-grade shoots over 350m of strike, with results up to 11m at 7.8g/t Au.
EM surveys and drilling programs are underway to refine and test deeper targets below existing shallow deposits.
Sulphide replacement of BIF is a key exploration vector, with strong correlation between pyrrhotite and gold.
Bottle Dump and other targets show drill-ready conductors and untested down-plunge potential.
Regional context and strategic opportunities
Located in the Murchison gold district with over 7.5Mtpa of milling capacity and multiple nearby processing plants.
M&A activity in the region is accelerating, with recent mergers and acquisitions among local producers.
Higher gold prices and cost deflation in WA improve economics for smaller and marginal deposits.
Tribute and joint venture mining and processing options offer low-risk, low-cost pathways to cashflow.
Latest events from Odyssey Gold
- Tuckanarra Gold Project advances with new drilling, permitting, and $9M capital raise.ODY
Q3 2026 TU29 Apr 2026 - Resource grows to 407koz Au, net loss narrows, and $3.2M raised for further exploration.ODY
H2 202426 Mar 2026 - 407,000oz gold resource, $4.2M cash, $2.3M loss, and $4M raised for exploration and studies.ODY
H2 202526 Mar 2026 - Net loss increased to $3.0 million as exploration ramped up, with new capital raised to fund development.ODY
H1 202611 Mar 2026 - Strong resource growth and near-term production potential drive project momentum in Murchison.ODY
Company presentation1 Mar 2026 - Tuckanarra Gold Project advances with 407koz MRE and strong cash reserves for exploration.ODY
Q4 2024 TU19 Nov 2025 - Diamond drilling and EM surveys drive resource expansion at Tuckanarra; cash at $2.6M.ODY
Q1 2025 TU18 Nov 2025 - Shallow, high-grade gold resources with strong exploration upside and strategic development options.ODY
Investor Presentation18 Nov 2025 - High-grade gold intersections and strong resource growth drive continued exploration focus.ODY
Q2 2025 TU18 Nov 2025